LQS EPOGUARD 150 – 2-component low solvent, coal tar epoxy coating

  • Brands:
  • SKU:
  • Status: In stock
  • Capacity:
  • Quantity : 1000

LQS Epoguard 150 is a 2-component epoxy coating system based on coal tar oil combined with low solvent content.

LQS Epoguard 150 after construction will create a coating with high adhesion and good waterproofing on many types of surfaces, effective anti-corrosion ability, and excellent chemical resistance.

Order now Call to confirm and deliver to your door

Product information

 

ADVANTAGES

  • Excellent chemical resistance.
  • Outstanding adhesion to most substrates (concrete, steel, etc.).
  • Good corrosion resistance.
  • Durable waterproof coating in environments with chemicals and waste.
  • Suitable for internal and external applications for structures immersed in water for extended periods.

APPLICATIONS

LQS Epoguard 150 is a chemical-resistant coating suitable for use in:

  • Wastewater treatment plants
  • Bridge piers submerged in water
  • Steel or concrete storage tanks
  • Oil tanks
  • Steel structure protection
  • Underground structures, concrete roofs, balconies, terraces

⚠️ Note: LQS Epoguard 150 is not suitable for surfaces in contact with drinking water.


APPLICATION INSTRUCTIONS

Surface Preparation:

Concrete:

  • Concrete must be sound and have a minimum compressive strength of 25 N/mm².
  • Surface must be clean, dry, and free from contaminants such as dust, oil, grease, old coatings, or curing agents.
  • Weak concrete or dusty surfaces must be removed.
  • Surface defects such as holes, voids, cracks, or protrusions must be repaired and leveled.

Steel:

  • Concrete surrounding steel structures must also be sound with a minimum compressive strength of 25 N/mm².
  • For surfaces in contact with chemicals, sandblasting is recommended to remove loose materials and contaminants (rust, scales, etc.), ensuring at least 95% surface cleanliness.
  • For surfaces not exposed to chemicals, remove all rust, scales, or foreign materials (until a clean grey surface is visible); follow recommended surface preparation tools and methods.
  • Coating must be applied within 3 hours after surface preparation for all metal substrates to avoid contamination or oxidation.

Moisture Check & Primer Application (if required):

  • Check surface moisture, ambient humidity, and dew point before application.
  • If surface moisture is < 5%, apply LQS Primer SB.
  • If surface moisture is ≥ 5%, apply LQS Primer MB (moisture-tolerant epoxy primer).

Mixing Procedure:

  • LQS Epoguard 150 is supplied as a two-component system:
    • Part A: Base Resin
    • Part B: Hardener
  • Mix Part A thoroughly on its own first. Then add Part B and mix using a mechanical stirrer, moving the mixer up and down during mixing.
  • Stir until the mixture is uniform, lump-free, with no sediment or trapped air bubbles.

Coating Application:

  • Apply the mixed product using a brush, roller, conventional sprayer, or vacuum spray system.
  • Apply the first coat in one consistent direction.
  • Apply the second coat in a perpendicular direction to the first, only after the first coat has dried (typically within 24 hours).

SAFETY INFORMATION

  • Personal Protection: Wear suitable protective clothing, gloves, and goggles during application.
  • Environmental Safety: Do not discharge into water sources or soil.
  • Transport: Not classified as hazardous for transport.
  • Refer to the Material Safety Data Sheet (MSDS) and other relevant safety documentation for more information.

 

Specifications

 

Specification LQS Epoguard 150
Component Liquid Epoxy and Coal Tar
Appearance Part A: Black resin

Part B: Light yellow, transparent

Mixture: Black color

Density Mixture: ~ 1.0–1.2 kg/liter
Mixing Ratio 5.7 : 1 (by weight)
Coverage Rate 0.2 – 0.4 kg/m²/layer
Number of Coats Minimum 2 coats
Application Temperature 5 – 35°C
Pot Life ~ 40 minutes (at 25–35°C)
Drying Time Hard dry: 8 – 24 hours

Fully cured: after 7 days

Recoat Time Minimum: 8 hours
Maximum: 24 hours
Recommended Coats 2–3 coats
Packaging Part A: 17 kg/drum

Part B: 3 kg/drum

Part A + B: 20 kg/set

Shelf Life 12 months (if unopened)
Storage Conditions Store in original, unopened, undamaged packaging

Keep in a cool, shaded area (10°C – 35°C)

 

ADVANTAGES

  • Excellent chemical resistance.
  • Outstanding adhesion to most substrates (concrete, steel, etc.).
  • Good corrosion resistance.
  • Durable waterproof coating in environments with chemicals and waste.
  • Suitable for internal and external applications for structures immersed in water for extended periods.

APPLICATIONS

LQS Epoguard 150 is a chemical-resistant coating suitable for use in:

  • Wastewater treatment plants
  • Bridge piers submerged in water
  • Steel or concrete storage tanks
  • Oil tanks
  • Steel structure protection
  • Underground structures, concrete roofs, balconies, terraces

⚠️ Note: LQS Epoguard 150 is not suitable for surfaces in contact with drinking water.


APPLICATION INSTRUCTIONS

Surface Preparation:

Concrete:

  • Concrete must be sound and have a minimum compressive strength of 25 N/mm².
  • Surface must be clean, dry, and free from contaminants such as dust, oil, grease, old coatings, or curing agents.
  • Weak concrete or dusty surfaces must be removed.
  • Surface defects such as holes, voids, cracks, or protrusions must be repaired and leveled.

Steel:

  • Concrete surrounding steel structures must also be sound with a minimum compressive strength of 25 N/mm².
  • For surfaces in contact with chemicals, sandblasting is recommended to remove loose materials and contaminants (rust, scales, etc.), ensuring at least 95% surface cleanliness.
  • For surfaces not exposed to chemicals, remove all rust, scales, or foreign materials (until a clean grey surface is visible); follow recommended surface preparation tools and methods.
  • Coating must be applied within 3 hours after surface preparation for all metal substrates to avoid contamination or oxidation.

Moisture Check & Primer Application (if required):

  • Check surface moisture, ambient humidity, and dew point before application.
  • If surface moisture is < 5%, apply LQS Primer SB.
  • If surface moisture is ≥ 5%, apply LQS Primer MB (moisture-tolerant epoxy primer).

Mixing Procedure:

  • LQS Epoguard 150 is supplied as a two-component system:
    • Part A: Base Resin
    • Part B: Hardener
  • Mix Part A thoroughly on its own first. Then add Part B and mix using a mechanical stirrer, moving the mixer up and down during mixing.
  • Stir until the mixture is uniform, lump-free, with no sediment or trapped air bubbles.

Coating Application:

  • Apply the mixed product using a brush, roller, conventional sprayer, or vacuum spray system.
  • Apply the first coat in one consistent direction.
  • Apply the second coat in a perpendicular direction to the first, only after the first coat has dried (typically within 24 hours).

SAFETY INFORMATION

  • Personal Protection: Wear suitable protective clothing, gloves, and goggles during application.
  • Environmental Safety: Do not discharge into water sources or soil.
  • Transport: Not classified as hazardous for transport.
  • Refer to the Material Safety Data Sheet (MSDS) and other relevant safety documentation for more information.

 

Review (0)

Rating LQS EPOGUARD 150 – 2-component low solvent, coal tar epoxy coating

5 0% | 0 rating
4 0% | 0 rating
3 0% | 0 rating
2 0% | 0 rating
1 0% | 0 rating
Review LQS EPOGUARD 150 – 2-component low solvent, coal tar epoxy coating
0 characters (minimum 10)